New ARXX ICF (Insulating concrete formwork) house in Meaford
Check back regularly to watch us build!
-
The Original Cottage -
The Demolition. -
Footings With Rebar -
ARXX ICF Build - First Concrete Pour -
-
-
Installation of structure walls. -
Walls installed for second floor. -
Wall ready for concrete. -
Pouring the wall concrete. -
Preparing floor for in-floor heat. -
Ready for in-floor heat. -
Installation of the roof begins. -
-
-
Installation of the in-floor heating system. -
Installation of steel roof. -
Steel Roof Installed -
Concrete floor poured. -
Second floor interior walls. -
Heating, plumbing and electrical rough-in started. -
Porch framed. -
After three weeks of delays, we have been informed that Bonneville Windows is bankrupt.
Windows have been ordered from a new manufacturer and will arrive in four to five weeks. -
Drywall board started. -
Drywall taping and mudding. -
Wood stove installed. -
Preparing shower for tile. -
Preparing the bathroom floor for tile. -
Painting started. -
Gable siding. -
Well drillers arrive for the geothermal loops. -
Two wells will be drilled for a total depth of 450 ft. -
Connections are made to join the two wells together and to pipe it in to the mechanical room -
Water furnace, pumps and water tank installed. -
Kitchen Installed. -
Flooring and trim started. -
Finished kitchen. -
-
-
-
-
-
-